1、The demand of Installation: 1)、The wall body and ground are request to get the nature water rate before preparing install the Bamboo Flooring. 2)、If you installing the ground stair must be prevent wet. 3)、Installing, place the Bamboo Flooring in the locale before two or three days, in order to fit of the locale?s wet. 4)、Leave about 1 centimeter extend and shrink gap between the wall and the floor. 5)、The Bamboo Flooring installing at last during the hour?s upholster.
2、The method of Installation 1)、We usually installing the Bamboo Flooring with the ground keel in the new building. ①The keel is made of dried wood board or other preserved angles materials, forbidden cement. ②You can installing the Flooring on the keel direct. It is better placing five-layer-wood on it. ③Before the installing, you using nail guns to nail the tenons on the keel with mortises at 45 degree and gluing the join between the keel and the floor. ④On the floor putting a little desiccant. 2)、Using the Direct Method on the flat ground or other floor. ①Paving the moisture proof colloidal sheet about 5-10 centimeter on the ground, leaving a gap around 5 centimeter between the floor and the wall and glued with not-dried paper. ②Installing the floor on the sheet directly and put a little glue at the joint. ③After paving of the bamboo layer, the tenons were used to extrusion the floor for a day then install the peripheral garnishing board between the wall and the floor.
3、 The Maintain: 1)、Keep the floor clean; wipe it with soft and wet cloth or mop at ordinary time. 2)、Prevent to soak in the water, dry it at once. 3)、You can put a soft mat on the floor to prevent to be damaged. 4)、Put a soft mat at the gate to prevent to take some soil in. 5)、Don’t scrape the floor with the sharpen thing or the heel of a shoe.
|